History

Construction of sedimentation pool to treat atmospheric water and oil separator installation.

2015

Acquired IPPC Permit (Integrated Environmental Permit).

2014

Introduced an advanced refining method of nickel in the form of granules.

2013

Investments in the expansion and efficiency increasing of ESP in rotary kilns.

2013

Construction of a new electrostatic filter in rotary kiln no.1

2013

Second phase of rehabilitation of slag deposit in Suka.

2013

Implementation of ISO 14001.

2012

Continual Emission Monitoring Station (CEMS).

2012

Implementation of ISO 9001.

2011

2 Airpointers (air quality monitoring stations) &Testo 350XL.

2010

Gases cleaning systems in electric furnaces.

2010

Steam plant according with EU standards.

2007

Wastewater treatment plant.

2007

Ferronikeli plant was bombarded during the conflict in Kosova in year 1999.

1999

The two line plant was built in 1984 using largely Soviet technology, but with certain elements such as the electric furnaces, rotary kilns and casting machines, based on Western designs.

1984

Indications of the existence of nickel ores in Kosovo , had already been discovered in 1958. The nickel ore deposits in the Kosovo are of oxide laterite type.

1958